Academic Block For National School of Business - Phase-01
Architects : Habitart Architecture Studio
Location: Bengaluru, Karnataka
Project Duration: 9 Months
Highlights:
This educational complex boasts a thoughtful design, featuring:
- Academic block with:
- Raked lecture halls
- Adaptable classrooms for 300 students
- Faculty block with:
- 40 staff rooms
- Accessible conference spaces
The design prioritises sustainability and comfort, leveraging:
- Natural light and ventilation
- Passive cooling
- Locally sourced materials (wire-cut bricks) for insulation and aesthetic appeal
- Form finish construction, eliminating the need for plaster
The result is a modern, eco-friendly, and functional educational space.
Value: 415 Lakhs
Status: Completed by July 2023
Academic Block For National School of Business - Phase-02
Architects : Habitart Architecture Studio
Location: Bengaluru, Karnataka
Project Duration: 4 Months
Highlights:
The second-floor expansion features a harmonious blend of:
- Structural steel roof with PUFF panels
- Classrooms with a theatrical floor design, utilizing Styrofoam blocks for filling
- Step glazing with mesh for enhanced air circulation
A striking feature is the structural bridge connecting two buildings, boasting a simple yet elegant covered roof that seamlessly integrates the spaces.
Value: 205 Lakhs
Status: Completed by November 2024
Expansion & Facelifting Existing Campus of TVS School
Architects : Urban Frame Private Limited
Location: Tumkuru, Karnataka
Project Duration: 4 Months
Highlights:
Located in Tumkur, Karnataka, our campus is nestled amidst lush natural trees and plants. After 30+ years, we've undertaken a major upgrade to modernize the facilities.
Key upgrades include:
- Replacing cement floors with vitrified flooring
- Adding floor area to classrooms
- Upgrading pathways and entrance portals
- Renovating classrooms to create a more conducive learning environment
The result is a refreshed and modernized campus that blends seamlessly with its natural surroundings.
Value: 365 Lakhs
Status: Completed by November 2025